Arroyo Seco Canyon Project
Conceptual Design Report
Figures and Tables

Please right-click on the caption to download the full image







Figure ES.1 Location of Existing Facilities and Overview of Project Areas



Figure ES.2 Comparison of Diversion Volumes and Impacts of Proposed.



Table ES.1 Summary of Estimated Total Project Cost



Figure 1.1 Location of Existing Facilities and Overview of Project Areas



Figure 2.1 - Devil's Gate Watershed



Table 2.1 Hydrologic Analysis of Flood Events



Table 2.2 Historic Water Volumes at the Arroyo Seco Diversion Structure



Table 2.3 Summary of 5-year Storm Hydraulic Analysis Results



Figure 2.2 Floodplain Boundaries and Hydraulic Analysis Cross Sections



Figure 2.3 Arroyo Seco stream downstream of the Diversion Structure viewed



Figure 2.3 Arroyo Seco stream downstream of the Diversion Structure viewed



Figure 2.4 Arroyo Seco stream downstream of the Diversion Structure viewed



Figure 2.5 Upstream of the Headworks Structure



Figure 5.3 - Headworks Restoration Area



Figure 5.4 Headworks Restoration Area Cross Section



Figure 5.7 Willow poles evolution at Las Virgenes Creek, Calabasas, California



Figure 5.8 Well placed floodplain islands are naturally vegetated



Figure 6.8 Site 2 topography



Figure 6.9 Dam Topography



Figure 7.1 Hydrologic analysis at the diversion structure



Figure 7.2 Hydrologic analysis of existing spreading basins



Figure 7.6 Area 3 Conceptual Retrofit Overview Plan



Figure 7.7 Area 3 Conceptual Retrofit Detailed Plan



Figure ES.1 Location of Existing Facilities and Overview of Project Areas



Figure ES.2 Comparison of Diversion Volumes and Impacts of Proposed



Figures 6.4 and 6.5 Dam Alternative



Table 2.1 Hydrologic Analysis of Flood Events



Table 2.2 Historic Water Volumes at the Arroyo Seco Diversion Structure



Table 2.3 Summary of 5-year Storm Hydraulic Analysis Results



Table 5.1 Qualitative Comparison of Restroom Options



Table 5.2 Restroom Facility Cost Comparison



Table 5.3 Preliminary Evaluation of Restroom Options



Table 5.4 Preliminary Cost Estimate Summary for Area 1



Table 6.1 Preliminary Comparison of Diversion Alternatives



Table 6.2 Preliminary Cost Estimate Summary for Area 2



Table 7.1 Existing Spreading Basin Capacity Analysis



Table 7.2 Summary of New Spreading Basin Geometric Properties – Alternative 1



Table 7.6 Summary of Additional Captured Water Unit Costs.



Table 7.7 Mechanisms that Affect Groundwater Recharge Basins



Table ES.1 Summary of Estimated Total Project Cost